bagasse firing in cfbc boiler

If you run into any problems with the boiler, please contact us directly by email or fill out the online service request.
We will do our best to resolve any problems you might have within 24 hours.

Our Cases Contact Us

TEL:+86 13506151331
E-mail: [email protected]
address:No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

zozen boiler
  • Boiler name: bagasse firing in cfbc boiler

  • Boiler Distributor:Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization

  • Email:[email protected]

  • Please email or call us for your inquiry

bagasse firing in cfbc boiler

Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization; The explosion door and flame detector are equipped for safe and reliable operation. Comb plates are used between both sides of boiler and tube bundle to avoid leakage of condensate and gas caused by using refractory concrete as sealing material. Air proof test is done before delivery in the factory to guarantee any gas leakage problem.

Big combustion chamber equipped with Low emission combustion burner effectively reduce the NOx to 30mg/m3. Smoke duct and smoke outlet use internal insulation to reduce operating noise.Combustion chamber uses full membrane water cooling wall structure and pressurized combustion without smoke mixture.

zozen boiler zozen boiler zozen boiler

    6. FBC BOILERS - EM ;

    6. FBC Boilers The combustion gases pass over the super heater sections of the boiler, flow past the economizer, the dust collectors and the air preheaters before being exhausted to atmosphere.

    Contact us

    Basics of Steam Boiler | ispatgu

    Basics of Steam Boiler. A steam boiler is an enclosed container where water is heated under controlled conditions to convert it into steam. Boiler is basically a heat exchanger where heat

    Contact us

    Circulating Fluidized Bed Technology - Department O

    Circulating Fluidized Bed Technology 4th EU South Africa Clean Coal Working Group Meeting Presented by Arto Hotta Foster Wheeler Energia Oy Kempton Park,

    Contact us

LEAVE YOUR MESSAGE !

7*24 hours of counseling service, offering the most effective and fastest service to ensure that
the loss caused by the failure for customers is minimized.

Contact Us